Trois-Rivières
The Next Level of On-Site Assembly
HASON’s 16,000 sf assembly shop in Trois-Rivières is operational 365 days a year. The facility harnesses HASON’s extensive expertise to build pressure vessels and assemble complex integrated FCC systems.
With a federal deep-water seaport less than a kilometre away, HASON can easily reach out to clients all over the world.
Trois-Rivières plant (16,000 sf)
- 16,000 sf indoor shop space
- 50T lifting capacity
- 35′ under-hook clearance
- 80′ x 60′ concrete pad for vertical assemblies
- Modular post-weld heat treatment furnace
- Electric DHT equipment
- 400T lifting capacity using hydraulic gantry