Trois-Rivières

The Next Level of On-Site Assembly

HASON’s 16,000 sf assembly shop in Trois-Rivières is operational 365 days a year. The facility harnesses HASON’s extensive expertise to build pressure vessels and assemble complex integrated FCC systems.

With a federal deep-water seaport less than a kilometre away, HASON can easily reach out to clients all over the world.

Trois-Rivières plant (16,000 sf)

  • 16,000 sf indoor shop space
  • 50T lifting capacity
  • 35′ under-hook clearance
  • 80′ x 60′ concrete pad for vertical assemblies
  • Modular post-weld heat treatment furnace
  • Electric DHT equipment
  • 400T lifting capacity using hydraulic gantry