18 February 2021 @ 15h00 | Realisations
A first assembly came out of our Trois-Rivières plant last summer. Weighing over 510,000 lbs, measuring nearly 105′ long with a nearly 20′ diameter, the FCC Reactor Vessel was delivered from the port of Trois-Rivières to a refinery in the South of the...
4 February 2021 @ 12h00 | Human Resources, News
Following the redesign of our website, we are continuing our efforts to be connected by being present on the main social networks (Facebook, Instagram, LinkedIn, Youtube).
30 November 2020 @ 11h19 | News
All the team at Hason is proud to welcome you on the new www.hason-steel.com ! After many months of hard work, we have finally completed the redesign of our website. This initiative was made to demonstrate to you the full extent of Hason’s expertise as well as...